PROJECT INFORMATION

CLIENT:          BOMBELA MAINTENANCE COMPANY
COUNTRY:     SOUTH AFRICA
LOCATION:    CENTURION, GAUTENG
DURATION (MONTHS):    13
TOTAL STAFF MONTHS:  30
START AND COMPLETION DATES (MONTH/YEAR): 09/2016 – 01/2018

PROJECT DESCRIPTION:

Turn-key telecommunication system extensions to accommodate the new car park at Centurion Station. The contract spanned a period of 14 months. It required extensive integration with the existing Gautrain telecommunication systems and infrastructure. Due to systems obsolescence, the CCTV, Cam-connect Software ( that controls CCTV views as a result of alarms) and Telephone Systems required upgrading or replacement to ensure continued compatibility.

The scope of works included 10 x CCTV Pole bases, 6 x pole mount PTZ cameras, 4x fixed PTX cameras, 2 x indoor fisheye cameras, new SCADA RTU panel to provide AFC interface, upgraded PABX software at Centurion Station, 2x new IP telephones, Fibre Optic Cable, extension of the existing Gautrain BMC network, new local CCTV fibre optic network and the extension of power services to the new car park.

DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED
  • Responsible for the detailed Telecommunications System Design which was based on the existing Gautrain systems as well as client requirements.
  • Develop Post Installation Check-out test documentation for all sub-systems.
  • Develop Site Acceptance Test documentation for all sub-systems.
  • Develop Systems Integration Test documentation for all sub-systems.
  • Develop new and update existing Gautrain drawings to allow for ‘Issue for Construction’ and ‘As-Built’ releases
  • Develop and perform System Factory Acceptance Test
  • Quality Control of production and galvanizing poles
  • Engineering and Installation site support
  • Project Management